Today we migrated a critical server to the new VI3 environment. This server was located on a ESX 2.5 standalone server. I have migrated this server using VMconverter. It takes only 30 min. to migrate live. Reinstall the network-settings takes another 10 min. After checking the new server, we disconnect original server from network and connect new server to public network. This is the first server with heavy workload. Now our VI3 can do something!
Big step in Asia.